Installed Capacity
6.5 MW
Households Powered
1,930
Current Stage
under-development
Developed by Green Gold Energy, the project is located at the Suburb in NSW, Australia.
Our dedicated GGE in-house development…
Installed Capacity
6.5 MW
Households Powered
1,680
Current Stage
Under-development
Developed by Green Gold Energy, the project is located at the Tailem Bend Suburb in SA, Australia.
Our dedicated GGE…
Installed Capacity
6.5 MW
Households Powered
1,870
Current Stage
In Operation
Developed by Green Gold Energy, the project is located at the South Hummocks Suburb in SA, Australia.
The project…
Installed Capacity
6.5 MW
Households Powered
1,870
Current Stage
In Operation
Developed by Green Gold Energy, the project is located at the South Hummocks Suburb in SA, Australia.
The project…