Proposed Capacity
6.19MW + 11MWh
Households Powered
N/A
Current Stage
Under development
This project is being developed by Green Gold Energy which is located at the suburb in NSW, Australia.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally, our development team specialises in achieving Connection…
Proposed Capacity
5.83MW + 11MWh
Households Powered
N/A
Current Stage
Under development
This project is being developed by Green Gold Energy which is located at the suburb in NSW, Australia.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally, our development team specialises in achieving Connection…
Installed Capacity
5.5 MWh
Households Powered
N/A
Current Stage
In Operation
This 4.9MWac solar project was commissioned on October 6, 2022. In response to the growing demand in the BESS market, and at the request of our client CHINT, a Battery Energy Storage System (BESS) was added in 2025 to optimise solar generation performance. Our…
Installed Capacity
6.24MW + 5.5MWh
Households Powered
N/A
Current Stage
In operation
This project, located in South Hummocks, SA 5550, Australia, was developed by Green Gold Energy, received development approval in March 2025, and commenced construction the same month.
The project was commissioned on 3 September, 2025
Our dedicated GGE in-house development team, supported by our engineering team,…
Proposed Capacity
4.95MW + 5.5MWh
Households Powered
N/A
Current Stage
Under development
This project is being developed by Green Gold Energy which is located at the suburb in NSW, Australia.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally, our development team specialises in achieving Connection…
Installed capacity
6.24 MW
Households Powered
1,795
Current Stage
EPC
Developed by Green Gold Energy, the project is located at the Coleambally Suburb in NSW, Australia.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. In Q3 2024, our development team successfully completed the…
Proposed Capacity
4.96MW + 5.5MWh
Households Powered
N/A
Current Stage
Under development
This project is being developed by Green Gold Energy which is located at the suburb in NSW, Australia.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally, our development team specialises in achieving Connection…
Proposed Capacity
4.95MW + 5.5MWh
Households Powered
N/A
Current Stage
Under development
This project is being developed by Green Gold Energy which is located at the suburb in NSW, Australia.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally, our development team specialises in achieving Connection…
Proposed Capacity
22MWh
Households Powered
N/A
Current Stage
Under development
This project is being developed by Green Gold Energy which is located at the suburb in NSW, Australia.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally, our development team specialises in achieving Connection Approvals (CA)…
Installed Capacity
6.24MW + 5.5MWh
Households Powered
N/A
Current Stage
In operation
This project, located in South Hummocks, SA 5550, Australia, was developed by Green Gold Energy, received development approval in March 2025, and commenced construction the same month.
The project was commissioned on 3 September, 2025
Our dedicated GGE in-house development team, supported by our engineering team,…
Installed Capacity
21 MW
Households Powered
4000
Current Stage
Under construction
Planning and site investigations for the 21 MWdc Papareireiā Solar Farm were completed in 2024, with construction successfully finished shortly thereafter. Green Gold Energy’s in-house EPC team delivered the electrical installation, ensuring the highest standards of safety and performance on site. Led by CHINT Green…
Installed Capacity
6.5MW + 5.5MWh
Households Powered
1,670
Current Stage
In operation
Developed and had its EPC (Engineering, Procurement, and Construction) services provided by Green Gold Energy, the project is located in the Mannum Suburb in SA, Australia.
The project was commissioned on July 23, 2024
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies…