Skip to content Skip to footer

GG02 Monash, SA

Installed Capacity 1.0 MW Households Powered 338 Current Stage In operation Developed by Green Gold Energy, the project is located at the Monash Suburb in SA, Australia. The project was commissioned on December 1, 2017 Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally,…

Read More

Moorook, SA

Installed Capacity 200 kW Households Powered 68 Current Stage In operation Developed by Green Gold Energy, the project is located at the Moorook Suburb in SA, Australia. The project was commissioned on September 23, 2017 Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally,…

Read More

Chaffey, SA

Installed Capacity 200 kW Households Powered 68 Current Stage In operation Developed by Green Gold Energy, the project is located at the Chaffey Suburb in SA, Australia. The project was commissioned on August 1, 2017. Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally,…

Read More

ABOUT US

Green Gold Energy is a company providing turnkey solutions for Solar+ Projects. 

       

ADDRESS

Head Office:

216 Glen Osmond Rd, Fullarton, SA, 5063 

Melbourne Office

Level 17, 570 Bourke Street, Melbourne, VIC 3000

Green Gold Energy © 2024. All Rights Reserved.

Loading...