Skip to content Skip to footer

Kadina, SA

Installed Capacity 5.7 MW Households Powered 1,639 Current Stage In Operation Developed by Green Gold Energy, the project is located at the Kadina Suburb in SA, Australia. The project was commissioned on March 2, 2019. Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally,…

Read More

Port Augusta, SA

Installed Capacity 6.6 MW Households Powered 1,897 Current Stage In Operation Developed by Green Gold Energy, the project is located at the Port Augusta Suburb in SA, Australia. The project was commissioned on August 17, 2018. Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects.…

Read More

Port Augusta, SA

Installed Capacity 6.6 MW Households Powered 1,897 Current Stage In Operation Developed by Green Gold Energy, the project is located at the Port Augusta Suburb in SA, Australia. The project was commissioned on August 17, 2018. Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects.…

Read More

ABOUT US

Green Gold Energy is a company providing turnkey solutions for Solar+ Projects. 

       

ADDRESS

Head Office:

216 Glen Osmond Rd, Fullarton, SA, 5063 

Melbourne Office

Level 17, 570 Bourke Street, Melbourne, VIC 3000

Green Gold Energy © 2025. All Rights Reserved.

Loading...