Installed Capacity
6.15 MW
Household Powered
1,820
Current Stage
In Operation
Developed by Green Gold Energy, the project is located at the Suburb in NSW, Australia.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally, our development team specialises in achieving Connection Approvals…
Installed Capacity
1.98 MW
Households Powered
676
Current Stage
In Operation
Developed by Green Gold Energy, the project is located at the Port Augusta Suburb in SA, Australia.
The project was commissioned on September 1, 2020.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects.…
Installed Capacity
1.98 MW
Households Powered
676
Current Stage
In Operation
Developed by Green Gold Energy, the project is located at the Port Augusta Suburb in SA, Australia.
The project was commissioned on September 1, 2020.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects.…
Installed Capacity
1.98 MW
Households Powered
676
Current Stage
In Operation
Developed by Green Gold Energy, the project is located at the Port Augusta Suburb in SA, Australia.
The project was commissioned on September 1, 2020.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects.…
Installed Capacity
200 MW
Households Powered
72,267
Current Stage
Under-development
The Australian Plains Solar & Battery Energy Storage System Project (APSP) consists of 200MWac solar and 200MW of BESS over a 325-hectare block of land situated in the Goyder council located in the Australian Plans region. The site has been secured in 2021 by the…
Installed Capacity
108 MW
Households Powered
47,400
Current Stage
Under-development
The Morgan Solar & Battery Energy Storage System (BESS) project consists of 130MWdc Solar and 91.7MWh of BESS over a 622-hectare block of land situated in Mid Murray Council located in the Stuart region. The block of land has been secured by the project owner…
Installed Capacity
6.5 MW
Households Powered
1,790
Current Stage
Ready-to-build
Developed by Green Gold Energy, the project is located at the Moama Suburb in NSW, Australia.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally, our development team specialises in achieving Connection Approvals…
Installed Capacity
6.6 MW
Households Powered
1,817
Current Stage
Under-development
Developed by Green Gold Energy, the project is located at the Suburb in SA, Australia.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally, our development team specialises in achieving Connection Approvals (CA)…
Installed Capacity
5.7 MW
Households Powered
1,566
Current Stage
In Operation
Developed by Green Gold Energy, the project is located at the Kadina Suburb in SA, Australia.
The project was commissioned on March 1, 2020.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally,…
Installed Capacity
5.7 MW
Households Powered
1,566
Current Stage
In Operation
Developed by Green Gold Energy, the project is located at the Kadina Suburb in SA, Australia.
The project was commissioned on March 1, 2020.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally,…
Installed Capacity
6.6 MW
Households Powered
1,817
Current Stage
Under-development
Developed by Green Gold Energy, the project is located at the Suburb in SA, Australia.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally, our development team specialises in achieving Connection Approvals (CA)…