Installed Capacity
200 MW
Households Powered
72,267
Current Stage
Under-development
The Australian Plains Solar & Battery Energy Storage System Project (APSP) consists of 200MWac solar and 200MW of BESS over a 325-hectare block of land situated in the Goyder council located in the Australian Plans region. The site has been secured in 2021 by the…
Installed Capacity
108 MW
Households Powered
47,400
Current Stage
Under-development
The Morgan Solar & Battery Energy Storage System (BESS) project consists of 130MWdc Solar and 91.7MWh of BESS over a 622-hectare block of land situated in Mid Murray Council located in the Stuart region. The block of land has been secured by the project owner…
Installed Capacity
6.5 MW
Households Powered
1,790
Current Stage
Ready-to-build
Developed by Green Gold Energy, the project is located at the Moama Suburb in NSW, Australia.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally, our development team specialises in achieving Connection Approvals…
The Kadina Solar Farm which developed by GreenGold Energy and owned by Astronegry-Chint was successfully commissioned via SAPN on 05th March 2020.
…
Installed Capacity
5.7 MW
Households Powered
1,566
Current Stage
In Operation
Developed by Green Gold Energy, the project is located at the Kadina Suburb in SA, Australia.
The project was commissioned on March 1, 2020.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally,…
CAPACITY
4.95MW
LOCATION
…
GG05 Bungama, SA 5540
Capacity: 1.65MW
Commission date: October, 2019
Our experts and outstanding developing experience contribute GreenGold into the leading solar developer in South Australia.
June 2018 GreenGold Energy and Astronergy-Chint has formed the partnership of developing 65MW Australia-wide. Astronergy is a specialized subsidiary of CHINT Group and is engaged in PV Power Station development and PV module production.
Great milestone projects that successfully…
Installed Capacity
1.0 MW
Households Powered
338
Current Stage
In Operation
Developed by Green Gold Energy, the project is located at the Monash Suburb in SA, Australia.
The project was commissioned on October 1, 2018.
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally,…
Sunlands, SA 5322
Capacity: 1MW
Commission date: December, 2017
Installed Capacity
1.0 MW
Households Powered
338
Current Stage
In operation
Developed by Green Gold Energy, the project is located at the Monash Suburb in SA, Australia.
The project was commissioned on December 1, 2017
Our dedicated GGE in-house development team, supported by our engineering team, meticulously identifies suitable land for our solar farm projects. Additionally,…